Modeling Project 2 Part 4

Calibrating GSSHA Model based on the optimized results from HMS

Dr. Nelson


Based on the optimized Green & Ampt and Clark parameters in HMS, change your GSSHA parameters as necessary and try to get as closer as possible to the observed flow data.

This process is the manual calibration of your GSSHA model. After you think you are done, report both the original and optimized parameters in the same spreadsheet that is sent to you with the observed flow data.

Note: Save As your project file with new name so that you will not lose your previous model. Again keep track of your effort and time you have been putting in these works.